Leander ISd
Shot blast to remove asphaltic adhesive
Faubion Elementary School
Prep for moisture mitigation system
We were contracted to shot blast to remove existing asphaltic adhesive (tested negative for asbestos). After shot blasting to create a CSP of 3, flooring contractor applied an epoxy moisture mitigation system due to high levels of moisture in the concrete. After installing the epoxy, vct flooring was installed.